Kalma Motors site viewed from Model Town Park, showing the showroom and service frontage on Ferozepur Road

3S Automotive Dealership Facility

Kalma Motors

A fully fitted 3S dealership in the heart of Lahore — sales, service and spares under one roof, with equipment, fixtures and machinery in place.

Gulberg III · Main Ferozepur Road, Lahore

23,500

Land area, sq ft approx.

21,000

Covered area, sq ft approx.

3,500

Existing showroom, sq ft approx.

08 - 02 - 01

Installed Vehicle Lifts - Washing Bay - Paint Booth

Square-foot figures · Gulberg III, Lahore · Areas subject to site verification

Sales. Service. Spares.

An established automotive facility with a fitted showroom, equipped workshop and dedicated parts-handling spaces.

Actual Kalma Motors showroom with reception, consultation desks and glazed offices

Sales · In place

Showroom floor

A fitted showroom with display space, reception, consultation desks, customer lounge and glazed offices.

Installed red two-post vehicle lifts at the Kalma Motors workshop

Service · In place

Workshop bays

Eight installed lifts, a paint booth, chassis aligner and tyre equipment, with two washing and two handover bays.

Existing Blowtech paint booth at Kalma Motors

Body & Paint · In place

Body & Paint Shop

An installed Blowtech paint booth with thermal blower, paint lab and mixing room. The body & paint programme includes a chassis aligner, three body & paint bays and a general works area.

Spares · In place

Parts & storage

The Spare Parts Store (Oil, Mechanical, Electrical, Moving, and Body) and the scrap warehouse are located on the perimeter.

Additional upper-level parts storage is shown in the proposed layout.

Existing consultation desks and glazed office cabins in the fitted Kalma Motors showroom

Management · In place

Management & Offices

Existing glazed showroom cabins accommodate operations, sales management, consultation and administration.

Kalma Motors architectural ground-floor layout showing the showroom and workshop programme; drawing is not to scale

Location

2–5 M Gulberg III,
Main Ferozepur Road,
Lahore

In the heart of Lahore, with excellent road visibility and convenient access for staff and customers. Showroom frontage faces Main Ferozepur Road.

View location

Status

Multi-Branded 3S Dealership Site

Hosted Mitsubishi Central Motors (Dewan Motors) 2001, Caltex (Chevron) 2009, Total Energies 2012–2019, and KIA Motors Ferozepur Road (Lucky Motor Corporation) 2019–2026. The site was converted to a 3S dealership site in 2019.

The showroom shares the road frontage, with a combined service workshop, body & paint shop and parts storage, and management, customer and staff facilities on the upper levels.

The site is an existing operational facility: showroom with fittings, furniture, furnishing, offices, power and allied systems; service block with fitted lifts, equipment, tools, body and paint booth already in place.

Existing · In place

Showroom 1 · workshop · equipment

Fitted furniture, fixtures, tools and machinery. Eight installed lifts, paint booth, tyre equipment, two washing bays and two vehicle handover bays.

Roof Level and Building services

10 TR ground-floor air conditioning, roof-level HVAC provisions and a 4,000 L water storage system support the facility’s building services.

  • Generator room at the rear corner, beside the engine & SST room.
  • Compressor room along the rear wall, next to the body & paint bays.
  • Underground water tank serving the washing bays, with three septic tanks alongside.
  • Underground oil tank shown beside the generator room; electrical / IT room in the showroom block.

The roof drawing marks a 50 TR VRF plant as TBC. The +14′ electrical / DB / server room is shown in the upper-level plan, not as a completed installation.

Actual rooftop view of Kalma Motors over Model Town Park
Existing rooftop · View over Model Town Park
Roof services drawing showing 4,000 litre water storage and the 50 TR VRF plant marked TBC
Roof +25′ · AWD-02 · VRF plant TBC
Proposed · Not completed

Showroom 2 · upper-level expansions

The second showroom and upper-level management, customer amenities and stock-storage expansions shown in the architectural drawings are planned, not completed.

Management & Staff Floor · +8′

The +8′ management-floor plan adds leadership cabins, meeting rooms and staff amenities above the existing showroom offices.

  • CEO, CFO, GM Operations and director cabins.
  • Conference and meeting rooms.
  • IT, call centre & MIS.
  • Staff dining, kitchen and prayer facilities.

The existing glazed showroom cabins remain in place; this floor is shown in the architectural drawings and is not completed.

Architectural plan of the +8 foot management and staff floor with leadership cabins, meeting rooms and staff amenities
+8′ management & staff floor · Proposed layout

Customer Experience Expansion

Six proposals for the +14′ customer level extend the lounge, service-bar and gym programme shown in the architectural drawings.

  • Children’s play areaSupervised space for families during service and sales visits.
  • Customer lounge expansionAdditional seating beyond the current lounge.
  • Computer & internet loungeA work-ready waiting space for service customers.
  • Coffee & snacks barBuilds on the lounge’s kitchen / service bar counter.
  • Customer gaming areaA leisure zone for customers while they wait.
  • Fitness & health loungeLinks with the gym shown on AWD-01.

These AW-02 proposals are not yet incorporated into the dimensioned AWD drawings. The +14′ customer-level expansion is not completed.

Proposed enlarged +14 foot customer-floor plan showing customer lounge, kitchen and service bar, gym, offices and prayer facilities
+14′ customer level · AWD-01 enlarged plan · Proposed

Parts & Storage · Upper level

Additional upper-level parts storage is shown in the architectural drawings, alongside the existing perimeter body-parts and scrap warehouses.

  • Body-parts and scrap warehouses on the site perimeter remain in place.
  • Upper-level stock storage forms part of the planned expansion.

The drawing sheet does not label its level. This upper-level parts floor is shown in the architectural drawings and is not completed.

Architectural plan showing the proposed upper-level parts storage and customer facilities
Spares · Proposed layout

Enquiry

Talk to us about
the facility

For facility enquiries, site visits or project information, reach the team directly.